This steel Middle Frame Fitting fits in the middle of a metal swing set frame between each set of two swing positions. This piece is a heavy-duty, two legged Middle Frame Fitting for 2 3/8" legs. These are designed to be used with schedule forty 2" pipe. To figure the length of pipe needed take the SIN of 65 degrees = .96 = Height and then divide by the length of the pipe. For example: a ten foot pipe would be 8 ft 10" above the ground. National Test Lab Results: 5000 lbs. Grade: Commercial. These fittings include all the hardware required to attach to the 3 pipes.
Pipe Leg Lengths Needed for Different Swing Beam Heights
(Leaves approximately 2ft of pipe in the ground)


Last Updated: 02/28/2009 01:31 AM - ID:636
Related Terms: swing set, swing, playsets, swingset, playground equipment, swingsets, metal swing set, swings, playset, metal swing set, metal swing sets