To build your own metal swingset, you will need two End Frame Fittings. These are heavy duty two-legged End Frame Fittings for two 2 3/8” metal pipe legs and a 2 3/8” metal pipe top-rail. One fitting fits at each end of the swingset. One Metal End Frame Fitting will work at either the right or the left end. You will need schedule forty 2" pipe for your swingset. National Test Lab Results: 5000 lbs. Grade: Commercial. These fittings include all the hardware required to attach to the 3 pipes.
| Pipe Leg Lengths Needed for Different
Swing Beam Heights (Leaves approximately 2ft of pipe in the ground) | ||||
|---|---|---|---|---|
| 8ft High Beam | 9ft High Beam | 10ft High Beam | 11ft High Beam | 12ft High Beam |
| 11ft 6in | 12ft 8in | 13ft 10in | 15ft | 16ft 2in |
| Each 2 swing position beam should be at least 9ft in width. Schedule 40, 2 Inch pipe is recommended. Schedule 40, 2" pipe is 2" inside diameter and 2-3/8" outside diameter. | ||||
The price below is for 1 end frame fitting, Please change quantity to 2 if you need more than that. You normally need two End Frame Fittings for a free standing metal swing set. (one for each side)
| Features: |
|---|
|
Can't find what you are
looking for? Us,
or you can call us Toll Free: 888-751-0101
|
Hours of Operations |
|---|
|
August-Feb: 9am-5pm Weekdays.
Closed Weekends |
| © Copyright 2001-2008 by BackyardCity.com. All Rights Reserved. Site maintained by VIMATA Interactive, Inc. |
Search Engine Optimization Services & Internet Marketing - CommerceFriends.com
Images Disclaimer: We have made a concerted effort to provide images that accurately represent the actual color, style, size & shape of each product. However, due to all the possible variants, including but not limited to: light source, monitor quality or settings, etc.; we can not guarantee that these images represent the actual colors of the product. Returns due to color discrepancies will be considered a return of a non-defective item as detailed in our Legal Policies.